Yes, there are many questions surrounding the buoyant actuator and PTO but before they can deploy one, the anchoring system needs to be sorted.
I can't see how they could fit in the installation of the anchoring system and the deployment of a C6 buoy/s, all within 2018. I would think the installation and testing of the foundation system would probably use up a weather window of it's own.
There would need to be a hell of lot of work going on behind the scenes for there to be even a remote chance of a C6 buoy getting wet at Sandpatch in 2018.
- Forums
- ASX - By Stock
- Recap of (almost) all wave technologies
Yes, there are many questions surrounding the buoyant actuator...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist