CBH 0.00% 7.0¢ coolabah metals limited

The cml7 site is situated in the middle of town. i dont think we...

  1. 83 Posts.
    lightbulb Created with Sketch. 1
    The cml7 site is situated in the middle of town. i dont think we will ever see a mill,tailings dam etc etc built on that lease it would be an environmental nightmare.idealy the dirt would be crushed on site and trucked to pem mill. or an underground traming drive from cml7 to perilyas underground ore pass /crusher / haulage system.
 
watchlist Created with Sketch. Add CBH (ASX) to my watchlist
(20min delay)
Last
7.0¢
Change
0.000(0.00%)
Mkt cap ! $9.390M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
CBH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.