Think this posted on another thread..but anyway.. i enjoyed readinf it over agin..
Hole 18 looking good..
HIGHLIGHTS: Drill Hole CSD-16-018 (“Hole 18”), intersecting visible copper mineralisation from 903.9m depth to current depth 1,321.5m. Intensity of veining and copper mineralisation is increasing with depth, as drilling continues towards a planned depth of 2,300m into the rich lower portions of the Alpala Central deposit. Intense veining up to 48% of the total rock mass observed. Drill Hole CSD-16-019 (“Hole 19”), at a current depth of 153m, targeting extensions of the upper portions of the Alpala deposit above Hole 16. Drill Hole CSD-16-020R (“Hole 20R”), at a current depth of 321.4m, and will act as the parent hole of at least 7 directional drilling “daughter” holes, testing up to 650m below the thickest, richest part of the Alpala Deposit. Access road to Alpala completed with vehicle access to Alpala Base Camp now fully operational and three drilling rigs operational.
DGR Price at posting:
9.0¢ Sentiment: Hold Disclosure: Held