CCE 2.50% 3.9¢ carnegie clean energy limited

The major scope elements include: Electrical – Central Emergency...

  1. 11,120 Posts.
    lightbulb Created with Sketch. 108
    The major scope elements include:

    • Electrical – Central Emergency Power Station and upgrades to power supply and distribution at the base.

    • Civil & Maritime – Improving maritime structures as well as road repair and car park rationalisation.

    • Communications – Work to communication systems.

    • Hydraulics – Infrastructure including sewerage, sullage and water supply.

    • Buildings – Internal and external upgrades including the Health Centre, Mess and Chaplain Centre.

    • The Base Entrance – Enhancements to the existing base entrance.

      Power and water are key elements in the upgrade, CCE will be kept busy for sometime to go.
 
watchlist Created with Sketch. Add CCE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.