Given Certification in Don Juan CSG field is 101PJ 2P reserves and 197PJ 3P reserves, the majority of this is in ATP771P permit. What about ATP593P permit? Is there going to be any drilling done by BOW on this?
http://www.bowenergy.com.au/donjuan.html