It would seem there are other options for the use of the pipeline that may not include Qenos in the long term.
From today's TO ann the last bullet point in
Strategic rationale for the Takeover Offer
is,
* In the longer term, alternative for the pipeline would be to convert to transporting liquids from thecprospective Cooper Basin oil fields,,,,,,,,