PT Energy Epic Sengkang (EWC) assist government authorities to determine gas appraisal test Sengkang.
STATE PROPERTY ASSESSMENT pick-test HELD IN THE FORM OF GAS
18 Appraisal DJKN Timba Science Assessment PT Gas to Energy Equity Epic Sengkang
| 10 April 2015 | 13 April 2015, at 14:56 | 264 times
Sengkang, South Sulawesi - For the first time, 18 assessors Directorate General of State (DJKN) to test the assessment quotation gas to PT Energy Equity Epic Sengkang (EEES) on 7-9 April 2015 in the Sengkang, Wajo, South Sulawesi. Pick-test assessment dominated the country's wealth in the form of natural gas was designed to determine the fair value in order to realize the optimization through analysis of the potential value of natural resources that could be used as a basis for decision making.
18 assessor is an assessor in the region of South Sulawesi Regional Office DJKN, East and West (Sulseltrabar) among others appraiser Selseltrabar Regional Office, the State Property Office and Auction (KPKNL) Makassar, Pare-Pare KPKNL, KPKNL Palopo, and KPKNL Kendari and representatives Assessor of the Directorate Assessment DJKN Central Office.
Prior to the field, speakers from the Directorate Assessment Helvita Dorojatun conduct briefings to the assessor who will perform pick-test. He said the oil and gas industry (oil and gas) are separated into two major areas, namely upstream ( upstream ) and downstream ( downstream ). Hulu is all the activities that are focused on obtaining crude oil and gas to the surface treatment process to become a product that can be sold. While downstream activities related to the refining of crude oil and gas to sales. "The key in the assessment of oil and gas there are four namely, the business cycle, price, technical, and cost, "he said.
Related to potential gas, Helvit said gas potential in Indonesia is greater than petroleum only very limited development on the installation or distribution ipa intalasi processing liquefied natural gas (LNG)
In addition, he also explained some things related to the upstream oil and gas phases in the process, the type of oil and gas contracts in Indonesia, the potential oil and gas reserves in Indonesia, as well as oil and gas related products DJKN law. By traveling the winding for approximately 6 hours, 18 assessors are learned by analyzing test data and exposure presented by representatives of PT EEES. Act. Fields Operations Manager PT EEES Suratmin describes several issues related to gas drilling began in 1995, the general picture Sengkang Block, reserves and remaining reserves in some places, among others, Kampung Baru, Walanga, Sampi-Sampi and Bonge.
In addition, he also describes the capacity of the Central Processing Plant (CPP) Kampung Baru which reaches 60 Million Standard Cubic Feet per Day (MMSCFD). As for the gas buyers in the CPP, namely, the State Electricity Company (PLN) 15.8 MMSCFD (27%), Kampung Baru Field 488 BCF (OGIP), PT Energi Sengkang 42.8 MMSCFD (72%), and Pertamina (city gas ) 0.05 MMSCFD (1%). He also explained in front of the assessors on the average production per year, channeling through the pipe, scenarios and lifting gas production facilities.
In the same place, Abraham from the Finance PT EEES explain the financial - profit-sharing contract for oil and gas . Abraham spoke about the financial process that starts from the plan of development, work program and budget, the authorization of financial expenditure and quarterly financial reports .
Representative Assessor M. Reza Floreal Wibowo said according to the Minister of Finance (PMK) Number 98 Year 2010 Property Assessment Controlled by the State in the form of Natural Resources there are six types of assessment of natural resources controlled to be assessed, among others, petroleum, natural gas, heat earth, minerals, coal and forests. "The test is conducted as a training quotes to make an assessment of the object," he said.
For two days representatives of PT EEES explain the intricacies of managing natural gas from drilling tometering . The assessors also to observe directly the gas wells, CPP, distribution pipes to the buyer, as well as metering of gas turbines to be sold. From the results of field studies and the data obtained, the assessor tried to make an assessment of natural gas and poured in the test report quotes assessment.(Bend-PR)
- Forums
- ASX - By Stock
- EWC
- PT ENERGY EPIC (EWC) APPRAISAL TEST SENGKANG
PT ENERGY EPIC (EWC) APPRAISAL TEST SENGKANG
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
-0.003(13.0%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 1.9¢ | $15.13K | 757.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1258505 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 77196 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 15.59pm 29/11/2024 (20 minute delay) ? |
EWC (ASX) Chart |