EWC 0.00% 2.0¢ energy world corporation ltd

projects and prospects, page-4

  1. 171 Posts.
    And that LNG then gets exported to the philipines, converted to power.

    1m tonnes lng = 50m mmbtu = enough gas to fire 750mw ccgt at 50% efficiency at 95% utilisation.

    Philippine electricity prices run at $200-$240 mwh. 600mw generates about 5gwh and revenue of $1b. The cost of the electricity and gas to ewc generate this is less than $100m-$150m once you back out the profits from the ppa and ppa. The capex required to build the power plants and lng plants is in the vicinity of $1.2b. There will be a few 10s of millions in transport and other costs.

    Interestingly Gordon wu, owner of cepa, and Stewart Elliot's last employer is also building a coal fired plant at pagbilao. .
 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.000(0.00%)
Mkt cap ! $29.24M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 33037 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 535695 1
View Market Depth
Last trade - 10.02am 04/12/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.