I would find it an amazing turn around if Western Power does not give CCE a substantial role in the SPS trial.
For over two years, they have been working together on this very thing.
Nowhere have I seen any negative comment about what has been achieved so far.
If there had been any negativity towards it, the West Australian would surely have been all over it. Just like they were in their scathing attack on Balance Energy for their Perenjori Project.
https://thewest.com.au/news/midwest-times/battery-power-a-dud-in-perenjori-locals-ng-b88801570z
In fact, Western Power has been full of praise with everything about the SPS trial.
https://westernpower.com.au/energy-...rials/stand-alone-power-system-trial-stage-1/
You could say, that the stage 2 trial would not be going ahead if EMC had not done such an outstanding job in stage 1.