"Assuming successful delineation drilling, the development of the West Seahorse field is expected to
be based on an unmanned monotower producing from a single well with the potential for add-on
including Wardie-1. The well is expected to produce at an initial oil rate of 4,200 stb/day/well and
decline harmonically. The field is expected to produce for ten years. The well fluid will be exported
to an onshore processing plant via eight inch pipeline. The produced solution gas will be
dehydrated, recompressed and piped (via 2.5 inch pipeline) to the monotower for gas lift. The
onshore facility will include crude stabilization, water treatment, chemical injection and utilities."
- Forums
- ASX - By Stock
- production plans in place
"Assuming successful delineation drilling, the development of...
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.20M |
Open | High | Low | Value | Volume |
9.1¢ | 9.1¢ | 9.1¢ | $24.94K | 274.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 73373 | 9.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.9¢ | 422595 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5356 | 0.110 |
3 | 295873 | 0.105 |
3 | 454409 | 0.100 |
2 | 189731 | 0.095 |
1 | 50000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 100000 | 1 |
0.130 | 48728 | 1 |
0.140 | 260375 | 2 |
0.145 | 70000 | 2 |
0.150 | 151165 | 2 |
Last trade - 10.41am 28/11/2024 (20 minute delay) ? |
TDO (ASX) Chart |