I specifically asked that and he would/could not say, only said there had not been any problems with the de-watering plan to date ...,
Pumping out at 1500 litres per second commenced on 2 August 2018 so should be over 40% now if it was going ahead on schedule for i t to be completed by the end of December 2018 as announced. (nearly 5 months pumping)
Apparently mining can be resumed before the pumping out is fully completed.
Professor Paul Dougas (non exc. director) has just recently topped up his holdings on market to now total nearly 685,000 shares in MGX.
It is very comforting to know this of a design, process and project engineer with 40 years experience is prepared to invest after the seawall construction.
I imagine he would have been intermittently involved with it and obviously confident of it holding.
All my opinion only.
.......................
NT.
- Forums
- ASX - By Stock
- Price slide and director steadily buying
I specifically asked that and he would/could not say, only said...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGX (ASX) to my watchlist
(20min delay)
|
|||||
Last
30.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $365.5M |
Open | High | Low | Value | Volume |
30.0¢ | 30.5¢ | 29.5¢ | $237.0K | 789.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 195619 | 29.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.5¢ | 195225 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 37120 | 0.920 |
3 | 45770 | 0.915 |
3 | 31253 | 0.910 |
3 | 68342 | 0.905 |
2 | 44392 | 0.900 |
Price($) | Vol. | No. |
---|---|---|
0.925 | 15328 | 2 |
0.930 | 89494 | 6 |
0.935 | 70442 | 3 |
0.940 | 72592 | 7 |
0.945 | 128342 | 5 |
Last trade - 16.10pm 25/11/2024 (20 minute delay) ? |
Featured News
MGX (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online