The cyclone season has not halted port delivery and loading so...

  1. 14,963 Posts.
    lightbulb Created with Sketch. 56
    The cyclone season has not halted port delivery and loading so far this season.......an it is still being loaded at record rates by the Fmg BHPb and RIO.....on the north west at the moment.....

    But a cyclone may disrupt supply anytime in the next 6 to 7 weeks.....

    Talking to a guy via phone said the water temp and air temp was a little colder than normal up Dampier and Port Hedland way.....for this time of year....
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.