PRE-FEASIBILITY RESULTS CONFIRM WORLD CLASS PROSPECTS FOR APURIMAC PROJECT IN PERU
Strike Resources Limited is pleased to announce the completion of the Pre-Feasibility Study (PFS) for its flagship Apurimac Iron Ore Project (the Project), in Peru. The PFS, which took nearly a year to complete at a cost of approximately A$2.75 million, focused upon the development of a 20 million tonne per annum (20Mtpa) mining operation with iron ore concentrate transported to the coast for shipment via a slurry pipeline. The PFS has confirmed that the Project has the potential to become a highly profitable world class iron ore operation, with: • Significant re-rating of resource inventory from JORC Inferred to JORC Indicated of 133 million tonnes (Mt) • Average operating costs of approximately US$14.5 per tonne • Total capital cost of approximately US$2.3 billion • High quality product grading +68%Fe, very low in Alumina, Phosphorous and other impurities If iron ore prices maintain their current levels, an operating cash surplus of approximately US$1.44 billion is forecast for the first full year of production and Project cash flows would be sufficient to repay the Project’s total capital cost within 2 years. First production from the Project is scheduled for the first half of 2012. Strike is now focussing on expanding its resource inventory in Apurimac and the commencement of a Bankable Feasibility Study (BFS). Commenting on the results of the PFS, Dr John Stephenson, Chairman of Strike said: "The completion of the Pre-Feasibility Study for Strike's Apurimac Iron Ore Project in Peru marks a major milestone for Strike and its Peruvian stakeholders. The independent studies by consultants of world standing in their field, together with inhouse analysis, has shown that the Apurimac Project alone has the capacity to deliver to Strike and its shareholders a highly profitable long term source of cash flow. This will be transforming for Strike, positioning it as a leading producer of high grade iron ores, principally for the Asian market. “I am extremely encouraged and excited by the results of this PFS and look forward to the next phase in the Project's development. Strike is confident that substantially more resources both at Apurimac and at Strike's other major Peruvian iron ore project at Cuzco will be uncovered within the next twelve months." 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 2 - DETAILS OF PRE-FEASIBILITY STUDY In August 2007, Strike commenced its PFS programme, under the overall supervision of Strike Director Professor Malcolm Richmond, to support a 20 Mtpa mining operation from its Apurimac Project area. The PFS included a series of studies project managed by Sinclair Knight Mertz (SKM). These studies covered the following broad areas: Study Areas STUDY PRIME RESPONSIBILITY Geology, Mining and Resource Snowden Group Mineralogy, Petrology and Characterisation CSIRO Process system design and testing Sinclair Knight Merz Plant and Site, Mechanical, Electrical, Power Supply, Port and Mine Sinclair Knight Merz Infrastructure Mine and Port Sinclair Knight Merz Port facilities Marine COSAPI S.A. Pipeline Design Pipeline Systems Incorporated (PSI) Community and Environment Sinclair Knight Merz Risk Analysis Sinclair Knight Merz Capital Cost Estimate and Operating Cost Estimate Sinclair Knight Merz The results of these studies are summarised below: OPERATING COSTS Average operating costs (excluding contingency, royalty and depreciation charges) per tonne of dry concentrate at full production are estimated (with an accuracy of +25%/- 10%) to be US$14.49 per tonne. An additional provision for contingency or ‘risk’ costs has been estimated at $1.45 per tonne. Operating Costs Cost US$/t Dry Description Concentrate Process, General and Administration 0.93 Reagents and Consumables 1.03 Infrastructure 0.40 Power 2.74 Spares 2.78 Mining and Geology 6.30 Port Operations 0.32 Total 14.50 Contingency 1.45 Total including Contingency 15.95 These operating costs are extremely competitive when compared with current and planned producers in Australia. Furthermore, this competitive advantage is likely to improve over time due to significantly higher inflationary pressures in the mining sector in Northern Australia compared to that in Peru. 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 3 - Operating Cost Comparison with Australian Iron Ore Companies Company Cash costs before royalties A$/t FOB Strike Resources (US$/t) 16 Fortescue Metals (FMG) – DSO 24 BHP (US$/t) 29 Rio Tinto (US$/t) 30 Midwest Corporation – DSO 38* Murchison Metals – DSO 38* Mount Gibson – DSO 42 Portman – DSO 42 Grange Resources – BFO 45 Gindalbie Metals - DSO 48 Source: BBY Limited (from Company Reports and Forecasts) * Includes A$9 capital charge for rail and port DSO = Direct Shipping Ore BFO = Beneficiated Feed Ore CAPITAL COST ESTIMATES Total direct and indirect costs for the project including engineering, procurement and commissioning are estimated (with an accuracy of +25%/-10%) to be approximately US$2.3 billion. An additional provision for contingency or ‘risk’ costs (which also includes an allowance for further possible savings, presently under review) has been estimated at US$200 million. Capital Cost by area Description Cost US$M Mine Site and off site infrastructure 361,082 Process Plant 341,971 Tailings 4 8,329 Concentrate Pipeline 489,962 Port 280,962 Water Supply 3 4,886 Electrical and Communications 5 4,654 Total Indirects 692,765 Total 2,304,611 Contingency 200,555 Total incl. Contingency 2,505,166 Indirect costs include (among other items) an allowance for Engineering, Procurement, Construction Management (EPCM), equipment freight and insurance, customs duties, start-up and commissioning. 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 4 - The capital cost estimates were developed from a detailed work breakdown structure of each process, with costs for equipment based upon budget quotations from major suppliers. A selection of contractors and suppliers were interviewed to compile relevant information for setting applicable rates and costings. A field survey in Peru was also completed, to check the correctness of rates. FINANCIAL EVALUATION Financial analysis by Strike confirms that the Project economics are potentially highly attractive. The capital and operating cost estimates from the studies, together with a conservative assumption of an average price of US$60 FOB per tonne of concentrate, suggest the Project will generate an operating cash surplus in the first full year of production of approximately US$890 million. If iron prices maintain their current levels (equivalent to approximately US$94 FOB), operating cash surplus in the first full year of production is forecast to reach approximately US$1.44 billion and would be sufficient to repay the Project’s capital cost within 2 years. GEOLOGY AND RESOURCE The focus of this study has been the Opaban I and Opaban III deposits, which were previously announced by Strike to represent a JORC Inferred Resource of 172 million tonnes at 62.28% Fe1. The Resource Estimate by Snowden Group has now provided a significant re-rating of the resource, from Inferred to Indicated status, delivering a total JORC Indicated Resource of 133,530,000 tonnes, more than 93% of which has been included in the mine plan. JORC Indicated Resource Estimate Location Tonnes Fe% AI2O3% SiO2% P% S% Opaban I 125,000,000 59.26 2.12 7.87 0.04 0.14 Opaban III 8,530,000 62.08 1.37 4.58 0.07 0.25 Total/Average 133,530,000 59.40 2.07 7.66 0.04 0.15 The main Opaban I deposit is an iron-skarn deposit, tabular-shaped and generally flatlying. Drilling has so far defined the dimensions of a mineralised body as being approximately 1,600 metres long by 300 metres wide, in a zone in which massive iron oxide deposits occur in several locations along a 5 kilometre northwest trend. TRANSPORTATION The transportation of ore will be by slurry pipeline from the mine site to the port. The pipeline route has been determined and is 363 kilometres in length. This route is shown in Annexure A. The pipeline will consist of 26/22 inch diameter, unlined, API X70 steel pipeline with two pump stations, one valve station and five choke stations. 1 Refer 23 August 2006: ASX market announcement titled “Peru Iron Ore Update on Apurimac Project“and 19 July 2007: ASX market announcement titled “Apurimac Project - JORC Resource Statement” 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 5 - The pump stations will be located one at the mine site and one located 85 kilometres along the pipeline route. The pump stations will provide the energy to transport the concentrate through the pipeline. The valve station will be required to isolate the pipeline system into two separate parts when the pipeline is shut down, reducing the static head in the pipeline system to approximately 4,000 metres of iron ore concentrate. The chokes will be required to dissipate energy (dynamic head) in the pipeline as the iron-ore concentrate descends from approximately 4,000 metres off the Peruvian Altiplano. MINING INFRASTRUCTURE A conceptual mine study into the Opaban I and Opaban III resources has been developed upon the basis that additional resource inventories are identified to support a production rate of 20Mtpa over 20 years. This study has provided: • Conceptual pit designs and infrastructure • Conceptual site layout, including location of main waste dump and haul roads • Conceptual mining schedule aimed at optimising value during the extraction of the Opaban I and Opaban III resources and conceptual satellite deposits • Estimation of operating costs and capital costs for the mining operation Mine strip ratios have been estimated at 1.71 for Opaban I and 0.66 at Opaban III. A more detailed geotechnical drilling programme will be required to ensure the correct pit slope angle is used. A highly conservative angle of 35 degrees has been used for the study, so the potential exists to steepen the slope and therefore reduce the strip ratio and further reduce mining costs. MINERALOGY, PETROLOGY AND CHARACTERISATION CSIRO were commissioned to complete characterisation of the mineralogical and petrological characteristics of iron oxides from the various ore types found in the Opaban I deposit. The work identified four important characteristics: • The iron mineralogy is made up of 60% hematite and 40% magnetite • The ore is coarse grained • There is widespread internal fracturing within the grains • The gangue minerals comprise silicates which are, relative to iron minerals, very soft 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 6 - Magnetic (low intensity and high intensity) test work on reverse circulation chip samples was very successful and has returned product grades at coarse crushing with particle sizes of 80% passing 125 and 250 microns as follows: Metallurgical Test Work Results Product Grade Fe 68.02 % to 68.28% Al2O3 0.30% to 0.35% SiO2 1.51% to 1.77% P 0.01% to 0.02% These excellent results suggest low energy consumption for the beneficiation process, which means lower operating costs. No floatation circuit is required as part of the beneficiation process. PROCESS SYSTEM DESIGN AND FLOW SHEET The Process Flow Sheet developed by SKM is shown in Annexure B. The beneficiation and production concept developed for the Opaban I and Opaban III ore bodies will require: • A Primary Gyratory Crusher for primary size reduction from minus 1000mm maximum to a P80 of 90mm • Secondary crushing and screening in closed circuit for feed size reduction from a feed P80 of 90mm to a P80 of approximately 13mm • High Pressure Grinding Rolls (HPGR) for the first stage of fines production • Wet screening of HPGR product at 4mm in closed circuit • Primary Ball mills for reduction to a P80 of 0.25mm Since the run of mine (ROM) grade is a very high 57% Fe and the mineralogy is conveniently interlocked magnetite/hematite, a simple two step magnetic separation will produce a high grade product. The two steps of magnetic separation will be as follows: • Low Intensity Magnetic Separators (LIMS) for magnetite concentration roughing and cleaning stages • Wet High Intensity Magnetic Separators (WHIMS) for hematite concentration from the LIMS tailings The concentrates will be ground to 100% passing 150 microns and 80% passing 48 microns, thickened and transported as slurry to the port via pipeline. At the port they will be dewatered (filtered) and stock piled for shipment. An overall process route has been defined based upon the design tonnage of 20Mtpa of dry concentrate grading approximately 68% Fe and a mass recovery from ROM feed of 70.3% based upon the expected head grade of 57% Fe. 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 7 - PORT SITE Port selection was based on the following principal considerations: • The port site needs to be sheltered from prevailing weather conditions and have a minimum of 20 metres water depth at low tides • The land area for the port site needs to have adequate space for dewatering facilities, stockpiles and residential buffer zone • The wharf facility must accommodate a 7,000 – 10,000 tonne per hour travelling shiploader, ship manoeuvring space, dolphins, buoys and anchorage locations • The site must be able to accommodate expansion to 40 Mtpa stockpiling, loading and shipping The bay of Tres Hermanas has been selected at the preferred location for the establishment of the Port Facility. Tres Hermanas has natural deep water and a semi submerged reef extending offshore, which offers protection from the prevailing weather. Bathymetric studies, including depth sounding and contour plotting have confirmed the suitability of the deep harbour. A depth of 20 metres is available at approximately 300 metres off shore. Jet probing of the bay area showed the sea bed to be several metres of sand over a rock base. Aerial photograph of Tres Hermanas Port Site Location The conceptual design of the port at Tres Hermanas comprises: • A rock fill breakwater based on the existing semi-submerged reef (thus requiring minimum additional rock fill) on the southern boundary of the bay • A steel and concrete wharf structure that supports a 7,000 tonne/hour ship loader • Mooring dolphins suitable for 150,000+ tonne cape sized vessels • Service jetty for tug boat access • Navigation aids and buoys The land area at Tres Hermanas is relatively flat, devoid of any sort of vegetation and is uninhabited. As such, it is highly suitable for the location of facilities to dewater, stockpile and load product at a rate of 20 to 40 Mtpa. Tres Hermanas is situated 13 kilometres from the town of San Juan and therefore allows the workforce to live in an existing town close by. 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 8 - PORT INFRASTRUCTURE The main elements of Port Infrastructure will comprise: • Filtration Plant • Product Stacker • Product Reclaimer • Shiploader The iron ore concentrate will be dewatered at the port through a filter system. Concentrate will then be fed by conveyor belt to the product stacker, which will feed on to the boom conveyor and discharge on to four stockpiles each holding approximately 250,000 tonnes. Stockpiled material will be reclaimed from the stockpiles by the Product Reclaimer and fed to the Ship Loader. POWER SUPPLY AND RETICULATION Power requirements for the Project at the mine site and port will be serviced from existing surplus capacity from the national grid system. The power requirement for the mine site is estimated at 125MW and for the port site 14MW, both of which can be serviced through the construction of new transmission lines to Peru’s main electricity grid. For the mine site, connection to the grid will be via an existing substation at Cotaruse, requiring approximately 100 kilometres of new transmission line to be constructed. For the Port, connection to the grid will be at the Marcona Substation near San Nicolas Port, requiring a new 30 kilometre transmission line. WATER SUPPLY The mine site is fortunate in its location in that there are large bodies of water nearby and the region has high levels of rainfall. The estimated quantity of water required for the mine site and pipeline operation is 17.8Mm3 (17.8 gigalitres) annually. The preliminary water modelling indicates that available water resources will be sufficient to cover the demands for both the plant and for concentrate transport to the coast. It is envisaged that the development of the water supply for the mine will also result in significant improvements to the quantity and quality of water supply to the local communities. Works required to store and distribute water to the mine site will include the construction of a small dam, charge tank, storage reservoir, pumping station and pipeline. The disposal of 12Mm3 (12 gigalitres) of water from the filter plant at the port presents an opportunity for the Project to enhance sustainable agriculture in the region. 20080723 SRK Pre-Feasibility Results Confirm World Class Prospects for Apurimac Project in Peru.doc - 9 - ENVIRONMENTAL AND COMMUNITIES The Project faces the usual environmental and community risks to any project at this development stage. The biophysical environmental challenges of rehabilitation, water management, flora and fauna, air, noise control and cultural heritage matters appear relatively straightforward using proven industry practices to manage the impacts to acceptable levels. Establishment of trust between the project and the local regional communities will be essential to address community concerns about the Project. NEXT STEPS With the positive results from the PFS, Strike is now aggressively targeting the following key Project milestones; • Expanding resource inventory in Apurimac to +300Mt (December 2008) • Completion of Railway Scoping Study (September 2008) • Completion of Bankable Feasibility Study (June 2009) • First Production from Apurimac (first half of 2012) Strike is investigating project alternatives to the central case described above, including the use of contract mining (to reduce direct Project capital costs) and the use of a railway instead of a slurry pipeline. A Preliminary Scoping Study suggests that a railway for transporting sinter fines and lump from the mine to the coast is technically feasible and would offer significant cost savings at the mine beneficiation plant. Further work is currently underway to more accurately analyse the value trade off. This work is expected to be completed by the end of September 2008. Strike notes that production from its Cuzco Lump Project is scheduled to commence sooner than the Apurimac Project, as Strike is aiming to commence 1 to 2Mtpa of lump production from its Cuzco Project area in 2009 to generate early cashflow. Also, Strike notes the potential for an additional 20Mtpa production from the Cuzco Project area. However the Cuzco area was outside the scope of this Pre-Feasibility Study. For further information: John Stephenson Shanker Madan Chairman Managing Director T | (08) 9214 9700 T | (08) 9214 9700 E | [email protected] E | [email protected] The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves has been compiled by Mr Hem Shanker Madan who is a Member of The Australian Institute of Mining and Metallurgy. Mr Madan is the Managing Director of the Company. Mr Madan has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves (the JORC Code).” Mr Madan consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears. DATUM ELEV 0+000 10+000 20+000 30+000 40+000 50+000 60+000 70+000 80+000 90+000 100+000 110+000 120+000 130+000 140+000 150+000 160+000 170+000 180+000 190+000 200+000 210+000 220+000 230+000 240+000 250+000 260+000 270+000 280+000 290+000 300+000 310+000 320+000 330+000 340+000 350+000 360+000 3752.5 3700.0 3777.7 4204.1 4200.0 4039.9 3940.6 3944.7 3945.5 4020.6 3869.6 3623.5 3332.2 3564.4 3814.2 4000.0 4250.0 4408.0 4151.3 4250.0 4306.4 4372.3 4414.7 4471.5 4420.8 4480.9 4531.2 4500.0 4500.0 4513.0 4431.8 4400.0 4400.0 4316.6 4268.9 4194.8 4059.8 3881.1 3603.0 3229.9 2854.4 2481.5 2730.4 3439.1 3513.0 3978.0 4038.1 3884.3 3613.1 3355.7 2913.1 2729.8 2504.5 2372.6 2100.0 2009.7 1991.1 1805.0 1827.6 1677.4 1497.3 1285.0 1076.5 936.6 737.4 517.3 568.2 541.3 500.0 379.6 250.4 100.0 100.0 00.0 PUMP STATION 1 KP. 0+000 PUMP STATION 2 KP. 85+000 CHOKE STATION 1 KP. 240+000 CHOKE STATION 2 KP. 256+000 CHOKE STATION 3 KP. 286+000 TERMINAL STATION 1 KP. 363+000 CHOKE STATION 4 KP. 320+000 VALVE STATION 1 KP. 180+000 BY ROAD CORRIDOR BY ROAD CORRIDOR BY ROAD CORRIDOR ROAD CORRIDOR BY ROAD CORRIDOR BY Mine Site Location Coordinates : N 8,483,722.08; E 680,436.31 Elevation : 3837 MASL Port Legend Pipeline Corridor (5 Km) OPTION B-5 Panamerican Highway Secondary Road River Department Limits Province Limits National Reserve 1.- TOPOGRAPHY INFORMATION PROVIDED BY INSTITUTO GEOGRÁFICO NACIONAL DEL PERÚ (IGN). 2.- NATIONAL RESERVES PROVIDED BY INSTITUTO NACIONAL DE RECURSOS NATURALES DEL PERÚ (INRENA). 3.- THE STARTING POINT (MINE SITE - OPABAN 1) AND THE LOCATION OF THE 3 PORTS (DE LOMAS PORT, TRES HEMANAS PORT, SAN JUAN PORT), IS PROVIDED BY THE CLIENT. 4.- COORDINATE SYSTEM ( WGS 1984 UTM Zone 18S). PJP5209-DWG-PL-007 B OPTION B-5 OPABAN 1 TO TRES HERMANAS PORT PLAN & PROFILE ISSUED 07/02/08 FOR INTERNAL REVIEW ISSUED FOR CLIENT REVIEW A B JLC JDR PFM M. LETELIER J.L. CALIXTO INDICATED OPTION B-5 - PROFILE HORIZONTAL SCALE 1:600,000 VERTICAL SCALE 1:200,000 363+000 360+000 355+000 350+000 345+000 340+000 335+000 330+000 325+000 320+000 315+000 310+000 305+000 300+000 295+000 290+000 285+000 280+000 275+000 270+000 265+000 260+000 255+000 250+000 245+000 240+000 235+000 230+000 225+000 220+000 215+000 205+000 200+000 195+000 190+000 185+000 180+000 170+000 165+000 160+000 155+000 150+000 145+000 140+000 135+000 130+000 125+000 120+000 115+000 110+000 105+000 100+000 95+000 90+000 85+000 80+000 75+000 70+000 65+000 60+000 55+000 50+000 45+000 40+000 35+000 30+000 25+000 20+000 15+000 10+000 5+000 0+000 Puquio PUMP STATION 1 Kp. 0+000 PUMP STATION 2 Kp. 85+000 CHOKE STATION 4 Kp. 320+000 CHOKE STATION 1 Kp. 240+000 CHOKE STATION 2 Kp. 256+000 CHOKE STATION 3 Kp. 286+000 TERMINAL STATION 1 Kp. 363+000 VALVE STATION 1 Kp. 180+000 OPABAN 1 De Lomas Port Tres Hermanas Port San Juan Port Pampa Galeras Barbara D'Achille (National Reserve) Cotahuasi (National Reserve) OPTION B-5 363 Km LUCANAS NAZCA ICA AYMARAES PARINACOCHAS CARAVELI LA UNION HUAYTARA SUCRE ANDAHUAYLAS ABANCAY PALPA CARAVELI HUANCA SANCOS ANTABAMBA VICTOR FAJARDO GRAU PAUCAR DEL SARA SARA CONDESUYOS VILCAS HUAMAN CHINCHEROS CANGALLO CASTILLA AYACUCHO ICA APURIMAC AREQUIPA AREQUIPA HUANCAVELICA TINTAY TURPO ANDAHUAYLAS HUANCARAMA CHAPIMARCA PICHIRHUA LUCRE TOQUEBAMBA SAN JUAN DE CHACÑA HUANCARPUQUIO JAQUI Acarí Bella Unión San Nicolas ANISO UPAHUACHO PACAPAUSA SAN FRANCISCO DE REVACAYCO CHAVIÑA CHAQUIPAMPA HUISJATAGNA ALHACONE HUAYLLANE CHANTANE HUANCA HUANCA PUQUIO LUCANAS S/N SAN JUAN SAN CRISTOBAL SAN PEDRO PUNCUHUAJA SANTA ISABEL SALSA SAN ANDRES SANTIAGO DE VADO NASCA NASCA VISTA ALEGRE PIRCA SAN LUIS PAJONAL CUPARA SANTIAGO NUEVO TAMBO QUEMADO UCHUYMARCA BUENAVISTA UCHUYTAMBO CHUQUIMARAN (DESTRUIDO) YANACA SORAYA SAÑAYCA ANCOBAMBA CHALHUANCA TORAYA COTARUSE CARAIBAMBA HUAYLLO COLCA PAMPAMARCA AYAHUAY TIAPARO POCOHUANCAPACHACONAS TAPAIRIHUA TINTAY SORAS APONGO CABANA CHIPAO AUCARA ANDAMARCA SONDONDO QUEROBAMBA ISHUA PAMPACHIRI MORCOLLA HUACAÑA PAICO POMACOCHA QUECA ASQUIPATA MOYOBAMBA RACJAYA SANTA ANA DE HUAYCAHUACHO SAN PEDRO DE LARCAY SANTIAGO DE PAUCARA JAHUAY ACARI LUCASI EL TORO AMATO LA ENCAÑADA NEGRA MACHADO PONGO COLAPAMPA HUAJUMA ARENAL TRANCA GRANDE LOS CARACOLES BEATITA CHALCO LA MUÑA MILAGROSA CELESTINA LLUCYUCA TOSO PARAJE PAMPA ALTA MOCHILCO EL PUENTE DEGOLLADERO SANTA ROSA SEVILLANA LOS RIFLES DOS POZOS LA LOZA LOS ANGE LES TRANCA BAJA CUESTA DEL MOLINO LLAMACHAYOC COLORADO PEDREGOSA BUENAVISTA LA MONJA LA MANCHA TORO MUERTO SAN FRANCISCO BRASIL CUESTA BOTITANO HUARANGUITO GRANDE SAN VICENTE DESPENSA LLANO LOMA BATIDERO DESAGUE LOS ESPINOS CHALCO ACARI PONGO ENNO FILLO ANCO LAYO PIRURO PAICA TISANI PALLCCA HUAYLLA PAMPAHUASI CHAGUAYA CHUPA PUICO ACHUANE CHAUPI TIPICCOCHA PALCA COLLPA LLOCA PUCA PASCANA MUCCGA PALLCA PALLANCATA RAYO TINCOJ COTANI CANCALLA CHACALLAU CHUSPA TACRA LOLLOTA ICHUMARCA SAN JACINTO PARARANI UTCO CAJUANE CAHUIÑA ANTACCOLLO COCHAHUACHO MAJLLA DELLAMCAMA OCCSALLAHUAYCCO PILLONE UCHACHA ANGOSTURA JUISAPATA QUELLOCASA NEGRO QUILCACCASA HUCAÑA CANCAÑO CULEBRILLA CAPILLA TOTORAPAMPA CARIAPANA PUCARA LAHUALLA QUISMARPAMPA TAMBO TOCRA YAURIMOCCO AMAYANI CHINQ UIRAY BOLSANI CARAYBAMBA CCAYCOPALLCCA QUELLO PATA OTORUNCO JACULTAMAYOC QUEÑAPUGRO PAMPACANCHA CARHUAYOC TACCR A UCHUYHUASI PILPINTO CHACUTA SULLCA JACULTA ACCHIHUASI PISAJOIRE VERDE VERDE PACCHETATA PELLONE TRAPICHE TACCATA SAYATA PUCAMACHAY TOLORA TUMAC HUAYCCO JANCORIPAYOC CHACAPAMPA ANCO RACCRA LAJUATA MILLPO SAYCATA AUQUILLCA COLANI CARAPAMPA HUAMANCUTE CUCUNSA SANJUARA YANAMACHAY HUINCHUYO SINEGUILLA CHAHUAYLLO CAIRALLCA LINDERO CHOQUE TUMACORCCO COCHALOMA SEÑUERE HUAÑACACA AZARANTA HUINCHUY PACOCIRCA COLCACHACA QUILCATA COLLAPAMPA JIMENEZ CONDORHUASI ISCAHUACA CHUNCURUMI PISCAPUQUIO YURACPACCHA JAMAYACHI TORMINE PALCASHERA PALCA PALCA PILLUNIHUAYCCO PATAN PACCHICHACA SAURIROSA PISQUICCOCHA XEXAJAYA HUAYLLACUCHO ANTAOCCO SOYHUAPAMPA CCATUNCULLA HUITOPATA SUYAMARCA VISCACHANE HUAYUNCA CONCAHUASI COLLACOLLAPAMPA HUARUTO HUINCAUYO QUISCAPASO COLLPA PACCHICHACA PALCA PARARANI PALLANCATA TISANI CAPILLA NEGRO PAMPAHUASI AJA CRUCERO AMOCA ANYAHUALA LLAIHUA BESICA TARUGA LAS TRANCAS HUAPI UCHUCHUMA TASTAYA TAYAPUNCO PACCHA QUIRAUNIOC INCACORRAL CHUQUIMARAN RIO SECO RAGCHI CHOJACOC ARCOHUAYJO NASCA TAMBO QUEMADO TAINO LLOQUEPATA TRANCAHUAYJO JARHUAC MATARA CAJLLU HONDA HUACHAYA SOCOS AJOHUAYCO YAURILLA JACRUYLLA TRANCAS PUCARA CARRIZAL SUITURUMI JAPACM ACHAY ASNO POTRERO APOHUAYJOJARAJARA SOCTOLLA IQUIÑA INGENIO CABRACANCHE JUANILLO TUNAL PAJCHA SAUCE TALACO JESJAPAMPA YURACYACU HUAYUCRO TINQUICORRAL CHAQUIHUAYJO CHAUCHILLA CUCHILLA CHAJILLAY ILLATORO CAYARA TOROMUERTO TORO MUERTO HUARANGUILLO SAPAYAL HOSPICIO PAUCAYOC VETILLA CANGUNGUE MOLLEPUQUIO CAJA ACONCHE PACAYNIHUA TAJO ACHUHUACO PAMPILLA PIEDRAGRANDE QUEÑA HUASI SAN VICENTE SAUCHUOC URUPALLA CANGANA TIERRA BLANCA HUANUPATA CHOZA PABELLON JAMAYOC VIEJA QUEMAZON UCHURUMI LINDERO PONGO USTUMA HUALLPAMAYO SANTIAGO SANTA ROSA ANGOSTURA UCHUYTAMBO HUARICOCHA YARAJALA MACHAYHUASI GRANDE CAMPAMAYOC CHIMANCA PACAYNIOC FALDAGRANDE MOLINO SURCUÑA CHACRACHACHA HUICIPARA TANYAPALLJA CINCO CRUCES SOL DE ORO AGUAPERDIDA PACCHAPATA SAN VICENTE ACONCHE CHAQUIHUAYJO SAN VICENTE HONDA SOCOS JESJAPAMPA HUANUPATA HUAPI TUNAL CHAUCHILLA RIO SECO CARRIZAL UNCHU CHAYUCA MILPO PACCHA LLINQUI NITI CAPAYA LARCA HUAYARA OJONE PUCARAY PILLCO TOTORANI LAHUAJOTO RUYROMAYO PIALPAMPA HUASCUYA TARIHUACHO AYATACSANA TARACORRAL JARAHUARANI TINTAYA PICHUSAYA YANAMAYO CHALLHUANCA CHEJERIRE CABALLONE ICHU ORJO JAURO PARCO CHANGAROJO TAMBO HUAR AJOY SOALLA LLEHUA LUCMACHAYOC OJARANA CHARIHUA HU ACA SA LAMBRAMA HUAYLLACHI CONDORILLO PARARCOCHA BIZARRUPA CHALONSIRI TASLAYOC CONDORTAPA ACOBAMBA HURUHUANI PACHACONAS PASHUANA CHAJONE COTARUSE OJEÑANHUAYJO JEÑUA ALLJA YAURICOCHA TAQUIPALLJA CHOJEPILLO YARJONE JALLAJA HUARANJULLA SEGUA SORACINJA MESTIZOS CANCANNIYOC TUMIRE CARHUAJAJA CHINCHIÑA HUAYLLARIPA PALCA SORIPUNCO SUROJHU AYJO JUISA COLCACHACA PARARANI LLACTACOCHA PALLCORA PICHUS CARAYBAMBA CHIUCHO AYAMAJE JASIRIA LAIME LLANCAYA FABRICAY CHALHUANCA LLOCLLA LLANTANIA CHOJAHUANCARA PUMAPUQUIO JACHJACHA JOLIHUAYJO FILLULLONE TUMAC ORJO HUILJA PUCA ORJO TINTASMA JOLLOCAMAYOC PALLJA OJOCUCHO HUAMILLANE PALMADE RA LAYHUAHUAYJO HUILJACOCHA ANTABAMBA JONTOMA TOTONCOCHA SAN CRISTOBAL PICHIRIJAY MILLO HUISCAPUCRO PAMPAHUASI JATUNPACCHA CHACALLAU CHAMAYOCPAMPA CEDRONE NUÑULCA COMUNILLA JAJATUÑISJA UNCHULHUAYNIYOC POTRERO PUCACORRAL ATOCOCORCO ANTARAJRA PASHUAÑA CHALHUAMAYO JATACHACA PACCHANTAY APACSA JATUNCAJCHAPI QUITOPACCHE MARAINIYOC QUIMSACRUZ CACSACUCHO TUNAPITA HUARAJONI HUASHUAPATA LLACHACA RANRAHUAYJO SARA SARA CUYOHUAYJO ANTABAMBA YANAMAYO CHALHUA NCA HUAYLLARIPA HUACASA HURUHUANI CHEJERIRE CHINCHIÑA JAJIN CURA CCOLLPA JIHUANE PACCHA MILLPO SACSALLA PALLCA TINTAY CHULLHUA HUAIJO HUISCA ARANJAPA JALLUCHI HUANCANI LLACSI YAURIPOASIN SICUANI ITANISO PUCARA PUCHUMA HUANCANE COLLPA YACUAMA IPARA BELEN ALHUAJA MAYO NEGRO QUICHQUICHA CHICRANCO JANTUNE PANCOY TOJEASJA YACUYOC SORAS JALLO JAHUNA SUCA SUCA PALJACHA CHESJONO CULLPALLCA HACER HUCHO LERIUYOC HUANCANICHA LLAMLLO TARA BARRO HUANCA PPAY JOSE PACCARI PALAIHUA CHOISANE MAIJA MANZAN A LLAHUISPA LLIHUAHUAJO MACHAY PUCRO HUASI PATA SANTIRE SARCO /ORCO HUÑAHUATANA QUILLIMSA HUAIJO VISCA PALLJA AGUADA HUICHO SALCCATA OJO PAMPA HUASAMAYO QUILCASTO PACHACHACA SAQUI HUAIJO YAHUAYRO CHAUPIHUASI PAUJARAYA LLALLAHUA LUPAYOC OJORUYOC TOLLOTA LLUCHA RUMI CRUZ BENITO HUAIJO HUARARI MISHCA YANAJOLLPA JALLO JALLO JELLO MAYO NEGRO MAYO TINCAC CACCA HUAIJO ANTALLA HUARAJOMAYO AJOPUNCO PACHINHUAIJO QUELLO TAXA JENCHENSA PAMPANA PALLAJO HUAIJO SOLABAMBA TANGALLUCIA CCARACCARA COLLOTACANCHA QUIMSAYACU JATUN MAYO BARTOLO HUAIJO OCHARAN MO YOBAM BA ACCHI HUACHAMA HUAIJO HUASI YURACRUME CHUCHI HUAIJO JOCHA JOCHA TOMA HUAIJO YANACUCHO CABRA CANCHA PATOPROTUNAN HUICCOCHO VISCA HUANCANI SICUANI VISCA HUANCANI LLINQUE PINCO LAUCCA CHACÑA CHICCHE YURI YUNCALLO TINGO CHUSPI CCORAHUIRE LAHUANI ACCEÑE TOTORA/ALTA HUANCANE TUYUCANCHA TUMA SAN MIGUEL PASAC HUASAHUAYJO CHIPANA AYUCCONIOR CALLEJON YANTAJA ACHICCOLLA AGUARIAS PICHIRHUA PUCAYA YACTO TERPA ATAURAN HUINTON MASURAGRA PUCALLAN POZAHUAYCCO CUMURUMI JOTO MARCA JACCYATA PUCHUNCO PACCHIPATA ANTAHUAYJO AYRAMPUYO HUAYCCOC AYACHUCO LLEHUA TUCUMACHAY CURIPATA APOPATA JATUNPUQUIO ÑUTISENGA PACCHI HUAYCCO YANAHUAYCCO CAVIRA CHALHUANI HUANCANI SINHUAYOCC HUAÑACA ANCAHUACHANA CCORIMINAS YANACCACCA LAMARHUAYCCOC CHILCARAGRA CELADOR LLOQUEPATA ACCOMAYO TICUYO HUAYCCO RURUPAYA ANCARAYLLO CHUCHIMBAMBA PINCOS CHUSPAHUAYCCO ARGAMA ACHIHUACHANAN JOICHIPACCHA CHURALMA PALLCCAMAYO CHUQUIBAMBA CABALLONE MARCUPATA PUMARARCCO JATUNHUAYCCO USCCULLUYOCC YANAYACO OYOCHUACHO RUYACC CCACCA SUITOOCCO CCELLUNI HUYTAPALLANA YAHUARI CCAYRA PUQUIO ATACORI SUPALLA ANTAPACCA SIPILLAYOC SANTA MARIA HUAMANHUACHANO CCEÑAHGUARAN ACCOBAMBAS HUAYCCO AYAPA MPA CHARAURO HUACOTO SORA YANAMA HUASCUYA MAPANI NEGRO MAYO ANTACCOCHA CHAVIÑA PACORAY JOCCGO HUALLUYO LABELAUISIN AUROPATA ICUSANI SAIHUA CHUSPIMARCA SAIROSA JOLTE LACCOHUASIN TACRA CCAPUTA JAHUACHO PALLJA COMULLA PARCCO ÑACAPATA QUENUARAGRA JESJE MAYO JAILPASCA VISCAC CCELLO CCASA SACA ANCO URUYHUMA ANTAMOJO URPANA HUINTO YADO ACCOYA UMACUNSIRI HUACHA HUACHA PUMAHUIRI RONCO RAQUIPUASIN HUAYCCOHUASI OCHUSO PACCHA HUAYUNCA CUCHUHUASI CHAUPI NASAMA YURACC YACU JAPASO CCUNIC HUARCAINE TOTORA CHAQUIPALLCA COLLPABAMBA COLLPAHUAYCO CHUSPINI SITIYACHANAN OCCETAMBO PUMARANGRA HUACCOLLA YARITA CUCHO MOJON ORCCO SORAPAMPA JATUNLLATCO HUAYCHAHUAJA TALLALOMA ANTA HUAICO PALLCCARANA SORACPAMPA PICHCAPUQUIO YURACM ACHAY CCAYLLICCASA ALLPASUNTO HUACHHUAPAMPA RACCHICHACA TINTAY TOCSA HUAYCCOC UCHUCSURA OCCE ORCCO POCOJOCHA YANA MAYO CHONTAHUAICO PAMPAMARCA CCUNUPAMPA CHAMPINI ANTELAHUACHANA CUCHIHUISCACUMPA TAMBILLOS OCCORACRA HACOPUCRO JOCCGO SAN VICENTE PACCHA PASAÑE JEJARA MOLLES CANAL AGUADA COÑICA TAN TAN PELIGRO SANTA CHURUMI ACAVILLE BRAMADERUYOC COLCA TASTAYOC ACARI JERJOJASA SANTA ANA REINOSO JATUNMOLLE CACHIPAMPA MOLLECHAYOC HUAYCO AJLAHUITO YAUCA LAUTINCO VENTANAYOC ANQUI HONDA CARRIZAL ANGOSTURA AZULORJO LANGUIRE LOS MOLLES JATUNJASA YURACYACU SAN PÉDRO CHULVE EL FARO SAN JACINTO ARENAL PAMPA DEL MORRO ALALO CONVENTO HUAYTULLA SANTA RITA QUIMBALETE YAPANA VISTA ALEGRE SUYTO CORRAL SAN LUIS CHUC CHURUMI ARGENTINA JAJANSA PUCA PUCA HUAJACRUME YUCRANE PEÑA BLANCA AJOPUQUIO CAÑAHUECA CRUZPATA LOS COLORADOS SILQUINE UCHUANI JATUNM AYAMI BIOLANDO PUMALLAULLI UTCUNE LAMPALLA MATARA LUCMAYOC PARALMAYOC LA ISLA LETRAYOCRUMI SANTA CRUZ TRES CRUCES PLANTERA CHINA YANAORJO CHILCAYOC AUQUIBUATO JOLTONSAYOC TRES MARIAS JESÑAME SACLLACHYOC YURAJCHICO HUARANGAL QUISUARAY MOLLEOC ANDARAYLLA SECA HUACATA JEPAJASA SANTA ROSA ARTESAYOC PAMPA REDONDA SACHASU CHO TAMBAO TRAPICHE SANGUIPAMAPA JEROPAQUINA ALTO MOTUTO CUESTA CHULVE HUAYJOHUASI TOTORAYOC MIQUIA CUESTACHAQUE QUEGUA LOROCHAYOC AGUADA TASTAYOC CONVENTO LUCMAYOC CARRIZAL PASAÑE QUIMBALETE ACAVILLE ACAVILLE TASTAYOC AGUADA ARENAL TRES MARIAS PALLCA S/N HUAJUMA PUCAJAJA JAJACHAJA LEJESA(HUACUY) UCHUYTAMBO NASA NASCA INCAHUASI JOCHANGA CHAQUIHUAYJO JARHUARJO HUASHUARA CONDORHUACHANA JAPASUYOC CHUPAS TOTORA QUISUAR JALALOMA CAÑA MOCHALA OTOTO ICHUORJO JAJANSA TERUCA CHIQUIM ARAN TINCO SANTA CRUZ GERONTA APACHETA SAÑO ACACHINA SAN PEDRO JONTAJ MATEVILAY JELLO TOROMACHAY CHILLHUA CUPITAY UYURUMI JEJAÑA JEÑUARA PISCOPAMPA DURAZNIYOC ICHMAJASA PACCHA ANTALLJAACARI LLAMASO PAUJALLE ALLJALLAQUE CALVARIO SALLA SARICA HUANCACHATA OJEGUINCHJA CHUJIJARA COJON JECHCA MARAYNIOJ HUAGRAORJO JATUNHUASI AFILANAYOC JALAORJO JALACHUGA CHUÑUÑA(CHACYA) HUAJCHASULCA PAMPAHUASI GRAMADAL AZULJAJA PACHAPATA LACLAJA PALLPO HOSPICIO HUACHALLA QUEÑUA HUASIA SAUCILLO JELJEÑA CHACYAHUASI PAIJOTO JUMILLA LLANCAPAMPA ÑAHUIN PUQUIO UCHPASORA PACHPUCHA PABELLON PUCAORJO HIGOSNIOC TAMBILLOS JESJEHUAYO SILLANA QUISUARPATA COLLOPAMPA MISQUIYACUHUAYJO TOROMUERTO LLUTUPALLANA CHAQUEHUAIJO CHAYÑACHA CHICHINA PUCAJASA SAYHUA PATA AYHUMARCA CUCHIMACHAY SARAPUCRO JEJACHA PUCHUNGO UCHCURUMI NUISCUCHAYOC HUACHAMACHAY USHPAHUAYJO LOJOPOASIN JE NLLUAHUAIJO SANQUIPAMPA PASAÑE MALPASO INCA CORRAL TRUNCAHUAYJO SAN JOSE SUYO TINCASORA PALMADERAS NATIMPALLJA QUISUAMIOC ÑAHUIPUQUIO TAMBOCHAYOC CALCAC PALLJORU TACTACHAYOC QUIRAHUACHAYOC HUACHUAJUAYJO LLIMPASAMANAN BACARAQUINA S/N APACHETA S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N ACARI S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N ICHUORJO S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N PALLP O S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N JALAORJO ACARI S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N S/N LUCANAS ICA CARAVELI NAZCA AYMARAES PALPA PALPA NAZCA CARAVELI NAZCA CARAVELI CARAVELI 450,000 450,000 500,000 500,000 550,000 550,000 600,000 600,000 650,000 650,000 700,000 700,000 8,300,000 8,300,000 8,350,000 8,350,000 8,400,000 8,400,000 8,450,000 8,450,000 D R A W I N G S L I M I T S D R A W I N G S L I M I T S D R A W I N G S L I M I T S D R A W I N G S L I M I T S SCALE 1:500,000 OPTION B-5 - KEY PLAN 0 12500 25000 50000 75000 100000 Meters
SRK Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held