Maiden JORC Resource ? Lake Chandler Potash Project
ActivEX (AIV:ASX) is pleased to announce its maiden resource for the Lake Chandler Potash
Project. The project (Mining Lease - M77/22) is located 45 kilometres north of Merredin (300km
east of Perth) in the wheatbelt of Western Australia. Potash extraction occurred at the site in the
immediate post-war period.
ActivEX Limited (?ActivEX?) has requested independent consulting geologists Hellman &
Schofield Pty Ltd (?H&S?) of Sydney, Australia to complete a resource estimate for its Lake
Chandler Potash Project in Western Australia. The reporting of these new resources is in
accordance with the 2004 JORC Code. All resources are in the Inferred Resource category as
follows:-
Table 1 Lake Chandler Potash Project Inferred Resources
Volume
(m3)
Tonnes
K2O
%
3,611,891 5,779,025 5.73
(significant figures does not imply precision, no cut off grade used; default bulk density of 1.6t/m3)
Infill drilling is required to upgrade the Inferred Resource estimate to Indicated and Measured
Resource categories.
ActivEX is reviewing mining and treatment options for the deposit and production rates of
150,000 to 300,000 tonnes per annum are being considered. At these rates a mine life of 20 to
30 years is envisaged.
Summary
The potash mineralisation at Lake Chandler occurs as alunite (KAl3(SO4)(OH)6) mineralisation
hosted in a flat lying evaporitic sequence (playa lake) of Recent age. ActivEX plans to review
options to mine the potash deposit using an open pit operation and the resources have been
classified on this assumption.
The new resources are based on rotary air blast (RAB) and aircore drilling results from two
exploration campaigns in the 1980s for a total of 112 holes. Drill hole spacing was
approximately 200 by 50m (see figure below) with samples taken over 1m intervals to an
average depth of 6m. Samples were assayed for K2O using fusion and AAS or ICP methods.
Sample recoveries were recorded as ?good? during the drilling campaigns. Results from six
twinned holes during the second aircore program indicate good correlation with the RAB
drilling for the neighbouring mineral intervals.
- Forums
- ASX - By Stock
- potash
Maiden JORC Resource ? Lake Chandler Potash ProjectActivEX...
-
- There are more pages in this discussion • 88 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AIV (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
-0.005(31.3%) |
Mkt cap ! $1.293M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.1¢ | $3.267K | 262.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 29967 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 272943 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 544 | 1 |
0.200 | 602528 | 4 |
0.265 | 18867 | 1 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
Last trade - 15.47pm 27/11/2024 (20 minute delay) ? |
AIV (ASX) Chart |