200 MW x US $ 200.000 = US $ 40.000.000 licensing fees for the first year
Not bad for a penny stock with current MC of about 21 million ( 1.3 -1.5 c , 1.5 billion shares )
?Furthermore, we understand SSNE are in the process of building a Kalina Cycle? assembly line in Shanghai capable of building up to 50 Kalina Cycle? plants annually, with individual power plant capacities of up to 6 megawatts (MW)?. Global Geothermal Limited receives licensing fees from its licensees (including SSNE) of up to US$200,000 for each megawatt (MW) of installed Kalina Cycle? capacity, as well as generating additional revenues from engineering services.
WAS Price at posting:
1.3¢ Sentiment: LT Buy Disclosure: Held