As Scarpa pointed out its about feed grade.
looked at Mineralised post on historical records on Manono if the average feed grade was 1.2% to 1.6 % so to bring the Tin grade to a positive grade on the high side of 4.5% need 3 to 4 times the amount.
Simplistic analysis is say 100000 tons at Manono @ $22000 =$2.2 billion dollars. mineralised
1,634 Posts.
384
Date:
25/03/17
Time:
00:24:53
Post #: 23616960
Start of thread
Still will be a positive credit to off setting transport costs but by how much ?
ALL IMO
AVZ Price at posting:
3.9¢ Sentiment: Buy Disclosure: Held