This is just for drilling an exploratory borehole to 830m to obtain core samples with the assurance it would be P&A'd two months later . Dart applied in June 2014 .
I'm not sure how much easier this will become after the election and once Digas/Cuadrilla have reference sites .
Looking on the bright side , although the economics of CBM can be excellent and capex is low , it could be considered an unnecessary risk to the main event - which is shale .
DTE Price at posting:
13.0¢ Sentiment: Hold Disclosure: Held