I think the writer has mixed up Energy world corporation with Pagbilao Energy Corp and confused is being coal-power based. In the gas section, the writer mentioned only one project i.e. of First Gen Corp. Never mentioned of the second gas project which I believe is EWC.
"Meanwhile, the target commercial operation of the 420-MW coal-fired plant of Pagbilao Energy Corp. and the 460-MW coal plant of San Buenaventura Power Ltd. Co. is set for November 2017 and June 2019, respectively."
- Forums
- ASX - By Stock
- EWC
- Philippines additional power 2015-2020
Philippines additional power 2015-2020, page-2
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
-0.003(13.0%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 1.9¢ | $15.13K | 757.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1258505 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 77196 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 15.59pm 29/11/2024 (20 minute delay) ? |
EWC (ASX) Chart |