EWC 13.0% 2.0¢ energy world corporation ltd

A 2300kVa line can comfortably take all of the power from the...

  1. 65 Posts.
    A 2300kVa line can comfortably take all of the power from the site and a hell of a lot more. Key delay is easements as this is plan B. This solution will meet all the needs for the power plant.

    There are currently 2*200MW turbines OCGTs on site that are ready to be commissioned once they have a fuel source and can dispatch power to the grid. This is not a solution to commission one OCGT and leave the other one and the CCGT solution dependent on further infrastructure from the government, even for EWC that would be ridiculous.
 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
-0.003(13.0%)
Mkt cap ! $29.24M
Open High Low Value Volume
2.1¢ 2.1¢ 1.9¢ $15.13K 757.5K

Buyers (Bids)

No. Vol. Price($)
2 1258505 1.8¢
 

Sellers (Offers)

Price($) Vol. No.
2.1¢ 77196 1
View Market Depth
Last trade - 15.59pm 29/11/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.