GRR 4.08% 25.5¢ grange resources limited.

From a 2012 presentation re Southdown proposal. • $150 million...

  1. 267 Posts.
    lightbulb Created with Sketch. 36
    From a 2012 presentation re Southdown proposal.

    Column 1
    0 • $150 million spent to date - an advanced project!!
    1 • JORC mineral resources of over 1.2 billion tonnes at 34.1% DTR
    2 • Ore reserves of 397 million tonnes at 35.69% DTR.
    3 • DFS mine life of 14 years within the current permitted area.
    4 NPV10% of A$1,008 million and an ungeared IRR of 16.6%.
    5 • Total resource indicates a potential mine life >30 years.
    6 • Capex is estimated at A$2.885 billion including EPCM, owners’ costs and contingency of A$0.535 billion.
    7 • Operating costs estimate of A$58.5 per tonne of concentrate
    8 • Initial production forecast for 2015;
 
watchlist Created with Sketch. Add GRR (ASX) to my watchlist
(20min delay)
Last
25.5¢
Change
0.010(4.08%)
Mkt cap ! $266.1M
Open High Low Value Volume
24.5¢ 25.5¢ 24.5¢ $277.9K 1.118M

Buyers (Bids)

No. Vol. Price($)
1 8697 25.0¢
 

Sellers (Offers)

Price($) Vol. No.
25.5¢ 300014 8
View Market Depth
Last trade - 16.10pm 28/11/2024 (20 minute delay) ?
GRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.