From a 2012 presentation re Southdown proposal.
|
Column 1 |
0 |
• $150 million spent to date - an advanced project!! |
1 |
• JORC mineral resources of over 1.2 billion tonnes at 34.1% DTR |
2 |
• Ore reserves of 397 million tonnes at 35.69% DTR. |
3 |
• DFS mine life of 14 years within the current permitted area. |
4 |
• NPV10% of A$1,008 million and an ungeared IRR of 16.6%. |
5 |
• Total resource indicates a potential mine life >30 years. |
6 |
• Capex is estimated at A$2.885 billion including EPCM, owners’ costs and contingency of A$0.535 billion. |
7 |
• Operating costs estimate of A$58.5 per tonne of concentrate |
8 |
• Initial production forecast for 2015; |