"A Programme of Work has been formulated and lodged with the Department of Mines and
Petroleum, WA to seek authorisation of follow up RC drilling and a drilling contractor has
been engaged and is scheduled to start in August 2011."
Blame the dept of mines in WA for delay, they must be eating donuts as well..