Any thoughts on why the delay in drilling the P’nyang South 2...

  1. 6,083 Posts.
    lightbulb Created with Sketch. 297
    Any thoughts on why the delay in drilling the P’nyang South 2 well that was supposed to be drilled this year?
    With Antelope 7 and Strickland drilling failures P’nyang is increasingly important to provide gas for additional trains for the PNG LNG Project. The PNG Government is yet to grant a PDL for the field and has been criticised for providing ownership over resources in PRL 3 P’nyang as soon as they switched on electricity to the Port Moresby grid from the LNG Plant at Caution Bay. But without full appraisal surely P’nyang South 2 well is needed before a PDL is granted? O'Neil says they (PNG Cabinet) want the JV partners to 'do a few things' before granting the PDL. It seems inexplicable that the P’nyang South 2 well was not drilled but of course there is a reason (that escapes me). It's not money, the failed Antelope 7 cost more than USD 16m, P’nyang South 2 well would cost less than USD 3m. Any ideas on this?
 
watchlist Created with Sketch. Add OSH (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.