Testing times indeed. Glad I disposed of my heads some months back but still kept and bought further oppies,
which on average are at half their price currently.
Problems are to be expected {and we've had plenty of them with 77H-albeit ALL solved now apparently, unless
any new ones crop up in the interim}. Getting past 10 weeks now since the great ann of 21/7 detailing light oil &
gas flowing to surface with 40% of frac water recovered. 10 WEEKS!
I personally still contend that 3 weeks maximum should be enough time to recover the remaining 25% of the
original frac water PLUS the additional water used for flushing of the well-bore, IF the well is flowing back
even 2/3's of what it achieved over the first 8 days.
If no announcement by the middle/end of next week I think it is looking very grim indeed for Oilex. The well
simply refuses to clean-up, whether that is due to a loss of pressure or a botched frac/proppant job who
knows. A lot of things missing from anns including gas flows {should have at least got the first 8 days worth
when the flow-back was unhindered and optimal}, amount of shut-down time, quantity of extra water used
in flushing treatment etc etc.
Anyway, would love to be proven hopelessly wrong. Been with the "story" for 5 years or so now.
GLTAH
- Forums
- ASX - By Stock
- OEX
- Options
Options, page-18
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online