It is a very interesting concept and easily executable if both parties are willing.
The simplicity in the process is for TMT to mine our high grade V and send it to Windumarra for processing calibration and testing over extended periods to generate high grade Vanadium within specifications. Subsequent to successful V production, both parties can make a final decision to relocate the facility with commercial terms.
This will cut down timelines and costs significantly rather than building a new processing facility.
ian Prentice and especially Michael Fry, David English would be able to add their thoughts to this concept as they have had direct involved with Windumurra and I am certain they would have professional relationships with Anthoni
TMT Price at posting:
24.5¢ Sentiment: Buy Disclosure: Held