Nothing to do with Sole-1. Shell took care of that back in the day. Besides, that well is 3kms away from S2 & has a smaller crest.
COE will b drilling along the main crest at S3 & S4, apprx 370m from Sole-2 & the two production wells are about 43 to 44 metres away. The structure & reservoir should b well understood as there is a 41m core that was cut back in 2002 with wirelinelogs & flowrate records (pressure, mmcfd etc).
The cored section had its poro/perm recorded in the Lab. So plenty of data. Logic suggests a replication of the same dataset for S3 & S4.
Only delay post completion will b the wait for tie up of the 2 subsea Xmas trees with the pipeline & subsequently flow to the plant at Orbost. Once that's out of the way (with no showstoppers), daily flwrates etc will b easy to monitor from the GasBB portal & Rev/Cashflw etc from the qtrly releases.
- Forums
- ASX - By Stock
- OM
Nothing to do with Sole-1. Shell took care of that back in the...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add COE (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $488.4M |
Open | High | Low | Value | Volume |
16.5¢ | 17.0¢ | 16.5¢ | $173.7K | 1.025M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 854516 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 51212 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 97807 | 0.495 |
9 | 340433 | 0.490 |
6 | 93000 | 0.485 |
16 | 586345 | 0.480 |
5 | 523974 | 0.475 |
Price($) | Vol. | No. |
---|---|---|
0.500 | 48427 | 3 |
0.505 | 358523 | 6 |
0.510 | 124819 | 4 |
0.515 | 133235 | 7 |
0.520 | 912777 | 15 |
Last trade - 16.10pm 11/11/2024 (20 minute delay) ? |
COE (ASX) Chart |
Day chart unavailable