EWC 4.35% 2.2¢ energy world corporation ltd

I suppose if you if it takes more than 10-15 years to complete a...

  1. 734 Posts.
    lightbulb Created with Sketch. 2
    I suppose if you if it takes more than 10-15 years to complete a project -- then you must be considered to be an expert !!!

    Discuss the Masela Block, the Central Government Brings the Energy World Corporation

    Bahas Blok Masela, Pemerintah Pusat Datangkan Energy World CoorporationJAKARTA, LELEMUKU.COM - The Indonesian government through the Head of the Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) Dwi Soetjipto said that it had brought in a number of oil and gas experts from abroad to discuss the Masela Eternal Field project in Tanimbar Islands, Maluku Province. 

    "The experts from each party have met. Further discussion is about the technical review," Dwi said when met at the DPR / MPR Building, Jakarta, Monday (4/2). 

    To CNBC Indonesia, Dwi said, the discussion with consultants from the Energy World Corporation (EWC) was carried out on Friday (1/2) last week. Later the experts will provide input in the preparation of the Masela Block Plan of Development (POD). Especially those related to technical issues. 

    Furthermore, he said, in providing these inputs, he would consider several technical aspects, such as the weight of the equipment, then design studies would also be carried out. So, later it can save on capital expenditure that will be issued. 

    "So all the design aspects that will have an impact on finance from the beginning are reviewed because in the end, if we have the cost recovery, we will secure everything," he said.

    He also confirmed that the scheme used was still an onshore scheme, because the scheme was the most suitable. 

    "So, later there will be a floating storage for the separation of oil and gas. While the LNG is onshore. That is being discussed because it has an impact on the cost," concluded Dwi. 

    Energy World Corporation Limited (EWC) is an energy company headquartered in New South Wales, Australia. The company which was officially registered on the Australian Stock Exchange in 1988 focused on the production and development of LNG projects operating in three countries, namely Australia, the Philippines and Indonesia 

    In Indonesia, the company is helping to develop a 315 MW gas power plant and the construction of a 2 mtpa liquefied LNG plant in Blok Senkang, Wajo, South Sulawesi, with the operator Energy Equity Epic (Sengkang) Pty. Ltd. 

    Meanwhile, regarding the construction of the Masela Block Abadi Field project, it has now reached the stage of awaiting POD approval from the Minister of Energy and Mineral Resources. 

    A number of work targets this year for the project undertaken by Inpex Corporation have been installed, namely obtaining POD, conducting public consultations related to environmental impact analysis (EIA), incorporating the Amdal reference frame to the Ministry of Environment and Forestry, and starting a baseline survey. 

    The Masela project is planned to start on stream in quarter II-2027 with an estimated 9.5 million tons of liquefied natural gas (LNG) production per year and 150 mmscfd of gas. The cost of developing the Abadi Field project is estimated at US $ 16 billion. (Albert Batlayeri)
 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $29.24M
Open High Low Value Volume
2.3¢ 2.3¢ 2.2¢ $2.31K 101.0K

Buyers (Bids)

No. Vol. Price($)
1 32067 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 5033577 1
View Market Depth
Last trade - 15.59pm 25/11/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.