no need to apologise, as you say it comes down to interpretation, I think the egg has started to dry on there faces from the bold statements on the size of Morabisi compared to Greenbushes, IMO if nothing substantial comes back from the assays the drilling program on Turesi is over, and probably the most sensible conclusion, with February 2019 as there cut off date they can afford to wait till the 7 holes are returned from the labs before deciding, GLTAH
GPP Price at posting:
0.9¢ Sentiment: None Disclosure: Not Held