The Chinese don't think HIsmelt was a failure ...
BSIET signed the contract for automation of SRV of Molong
date:2015-2-11 16:10:00
Recently, BSIET and Molong Petroleum Machinery Company Shangdong signed a contract for programming, debugging and technical service for HIsmelt SRV proper.
BSIET is one of the four AE (Accredited Engineer) in the world and also the only AE granted the HIsmelt technology in China, having sufficient technical reserve and design strength in design of HIsmelt project. Shangdong Molong Petroleum Machinery Company is a professional petroleum machinery manufacture and service provider, as the enterprise develops and in order to further increase market competitiveness, plans to introduce HIsmelt iron making technology to produce 800,000t hot metal per year to supply the enterprise with hot metal. In 2012, both sides officially signed the contract for the design of HIsmelt iron making project SRV.
Ref: http://www.bsiet.com/en/news/680.html
- Forums
- Commodities
- Obligation to produce Iron and Steel in Australia
Obligation to produce Iron and Steel in Australia, page-9
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)