Connection costs to hub were low as I recall (<$1m?) . The length of the pipeline is about 3km from the southern tip of the island to the northern tip - and its flat!.
Some more information on fast-tracking gas infrastructure in tanzania :
http:www.dailynews.co.tz/home/?n=23312
Regards
G