.... and from your paragraph about the 20% increase in ‘mining material movements’ required over the next two quarters it seems we will be paid even more? In the short term at least ...
... “The site management team and NRW are focused on rapidly improving material movements through a range of measures already underway.
These include implementation of Deswik, a more sophisticated mine planning system, employment of additional planning and drill and blast engineers, a significant lift in reporting by and collaboration with mining contractor NRW, and as described, additional equipment and manpower...”
On the GCY thread @Davisite said they were at a conference or something recently where GCY was the subject of much talk .
That means there are a LOT of people looking at what us going in out there .
And they are all looking at NRW too.
If Jules can keep this alive everyone is going to know who the hero is