Really ?
Firstly let go with these words of wisdom: "One of the things I enjoy about the majority of posters on this thread (compared to some others) is everyone is treated equally here irrespective or their investment. Likewise, your opinion will be respected provided it's not a widely sweeping statement with no evidence to back it up. We all learn from each other - so whether someone wants to put their "2 cents in" or their "20 cents in" speak up." https://hotcopper.com.au/threads/tr...3233876/page-85?post_id=22721252#.WtbqhdOuxm8
Turesi:
Lithium has finally started drilling after a 6 week delay (remember, 1st week in March they were starting)
OHD:
I would really be interested into why/how you can actually come to the conclusion the OHD project is progressing well?
Lets take a look at IMO only why it is failing every shareholder that has brought into GPP on the back of managements fluffed up announcements. We only have to look at the current 1/2 year to conclude it is struggling but consider these posts:.
Notes taken from the Dec 2016 AGM: " I guess for me I walked out feeling a lot more excited about the coal project then I was before simply due to my ignorance I believe. Biggest thing is we should expect some sort of PFS in December or January with figures and numbers" - and thats Dec 16 / Jan 17 btw https://hotcopper.com.au/threads/agm-notes.3083273/?post_id=21013010#.WtbobtOuxm8
Recent events:
Nov 17 - failed government grant, may not seem like a big deal but it has stemmed the plans some what as GPP were anticipating these funds to provide funding for our own PDU (needed to have enough bio-stimulant oil) for field trials.
Outcomes: Field trials Tomato - ongoing hydroponic and small scale activities, awaiting a final report from Monash.
Considering on the 18th December 17 they announced that FIELD tomato trials were to begin in Echuca https://www.asx.com.au/asxpdf/20171218/pdf/43q7rn71zc44hm.pdf
as well as Broadacre Tomatoes grown for the processing industry (pending approval from APTRC) a study will commence with tomato growers in the Shepparton region in November 17 https://www.asx.com.au/asxpdf/20170608/pdf/43jt5dq1h5kwch.pdf
Wheat - small scale Monash trial
But they did say: Field trials pending approval by the Riverina Plains Group, this study will commence in April 18 - maybe we will get an announcement soon on this? https://www.asx.com.au/asxpdf/20170608/pdf/43jt5dq1h5kwch.pdf
Why, with the government willing to spend millions in the Latrobe Valley has GPP been unsuccessful in gaining a grant again???
Thermaquatica's PDU spends considerable time non operational due to design limitations
As well as this little gem from the September quarterly:
It was decided that GPP will build their own PDU and locate it in Victoria, the unit once commissioned should be operational in the first half of 2018 https://www.asx.com.au/asxpdf/20171030/pdf/43nqzp42k4k9t6.pdf