Interesting results today from ABM around TAM's Groundrush deposit (just to the North and West) on ABM's suplejack project - would make sense if they go ahead that CTP would be the closest processing point... wonder if NST are watching this...
1,608 metres of RC drilling into four targets on our 100% owned Suplejack Project:
Eight out of ten holes intersected strong mineralisation
Multiple structures intersected in several holes
Results of four of ten holes drilled have been returned and are reported
Seuss Fault
2.5m1 @ 11.7g/t gold and 4m @ 26.6g/t gold (SSRC100044)
13m @ 7.3g/t gold including 7m @ 12.7g/t gold (SSRC100047)
Tethys – Seuss Intersection
5m @ 8.5g/t gold (SSRC100045)
12m @ 2.6g/t gold (SSRC100046)
Hyperion South- Strike length of mineralisation drilled has increased to over 600m
https://hotcopper.com.au/threads/an...m-suplejack-rc-drilling.3919070/#.Wjhx0t-WaUk
- Forums
- ASX - By Stock
- TAM
- NST future planning for Groundrush
NST future planning for Groundrush, page-12
Add TAM (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.001(3.57%) |
Mkt cap ! $37.60M |
Open | High | Low | Value | Volume |
2.9¢ | 2.9¢ | 2.9¢ | $3.148K | 108.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 607826 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 205507 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 321404 | 0.040 |
2 | 202907 | 0.039 |
1 | 33000 | 0.036 |
1 | 50000 | 0.033 |
1 | 20000 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 706406 | 1 |
0.044 | 23577 | 1 |
0.045 | 24750 | 1 |
0.046 | 215109 | 1 |
0.047 | 198000 | 3 |
Last trade - 15.13pm 22/11/2024 (20 minute delay) ? |
TAM (ASX) Chart |