APC 0.00% 0.1¢ australian potash limited

6 months is a little optimistic i think. Scoping study should...

  1. 1,616 Posts.
    lightbulb Created with Sketch. 190
    6 months is a little optimistic i think. Scoping study should reveal all we need to know, works required, pond construction, production pumps install/commissioning, cash raise/finance, license required and application, and with any luck a timeline.

    Sit tight we will know more soon but I'd be thinking along the lines of end 2017 all construction and pumps complete with possible first pond filled ready for 2018 first product. With any luck I'm way off and we see first product 2017.
 
watchlist Created with Sketch. Add APC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.