Latest plan estimated 7 mtpa from a single long wall, so the 2nd would have been phase 2 and some time off. Bit of a moot point now, though.
AN1 CuFe sells its Crossroads gold royalty to Northern Star for $4M cash; says better than waiting for mine launch
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks