-
Share
7,501 Posts.
165
12/08/14
11:00
Share
Hi Andy and long term holders,
(1) The ann 10th April 2014 said:
"Splay vein (av 59 g/t au) is in close proximity to current
3 level development at Talang Santo mine"
(2) The recent ann 5th Aug 2014 said:
"Mining is being undertaken on both 2 and 3 levels"
So, if we put (1) & (2) together we can assume that
mining on 3 level should be very close to the high
grade Splay vein. ( and don't we need it !)
Cheers
Moorookamick
-