BigFella
Ans :
Louise 4 Jul '13
The well reached a TVD of 12,455ft in mid-December 2012. Electric logging operations confirmed net pay of 31ft in the Cris R II and 49ft in the Cris R III sands.
Post drill, gross reserves are estimated to be 952,000 bbls oil and 0.4 BCFG in the Cris R II & III. The well will produce the thicker Cris R III reserves following which the overlying Cris R II will be completed for production.
Very fast drill so far , The extra time estimate could be for Side Tracking to
improve the Pay zone if desired .
There was mention of the Well running 40 to 50 feet higher than expected,
DNR Well report now Wed our time , surely an Ann before that.
CH$$RS R15
- Forums
- ASX - By Stock
- GGE
- News: Grand Gulf Energy hits oil and gas at Louisiana oil well
News: Grand Gulf Energy hits oil and gas at Louisiana oil well, page-25
-
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.380M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $3K | 1M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 19418675 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 175000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 27599472 | 0.004 |
11 | 4475392 | 0.003 |
11 | 11600000 | 0.002 |
8 | 42550054 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1150528 | 3 |
0.006 | 5120000 | 2 |
0.007 | 1285351 | 3 |
0.008 | 5480000 | 10 |
0.009 | 400000 | 1 |
Last trade - 12.25pm 22/11/2024 (20 minute delay) ? |
Featured News
GGE (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online