Duane, remember they announced on 2/11 they had drilled to casing depth of 108m and had to cement casing which I have a concern with terminology. Do they mean concreting or a sand/cement slurry or are they dumming down, no one uses cement and water alone, it does nothing. Cementing means nothing.
On 9/11 they announced drilled to 325m and intermeadiate casing depth which needed to be "cemented" and blow out preventers tested.
If it took a week to do stage 2 I would guess it will take a week or two to reach 1000m.
GGX Price at posting:
12.0¢ Sentiment: LT Buy Disclosure: Held