BLD 0.83% $6.10 boral limited.

It is a worry to see Boral falling so low. A 7% drop today! And...

  1. 692 Posts.
    lightbulb Created with Sketch. 2
    It is a worry to see Boral falling so low. A 7% drop today! And it was already very declined.
 
watchlist Created with Sketch. Add BLD (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.