This deposit was drilled-out when Ochre got their hands on it after Talisman sold it onto them. No upside here. Stranded deposit with sub-optimal iron grade and metallurgical properties, road hauling to Port Hedland and then trans-shipping out of the harbour to boats waiting offshore ? Good luck for production in 2015.