If NAGs gets one PASS Contracts then it will get ongoing and the pits will be full within 10 years (because there are multiple future PASS Projects).
The Capacity of the pits is 6.2M tonnes, so even at $50/T (though I think $70-$80 is realistic). 6.2m T x $50 Net is $310M Profit or $31M pa. Say Net of $30M pa Profit fed into a EPS of 12 = $360M. There are about 5M shares (grossed up) so that 72c Share.
That's why it spikes on a sniff (25c plus). On the actual for PASS Contracts I reckon around 70c and I've just shown the basis for that Assumption based on $50/T (72c). I't'll be more than $50/T and SP will be closer to $1 imo.
- Forums
- ASX - By Stock
- New No 1 World Gold Producer
If NAGs gets one PASS Contracts then it will get ongoing and the...
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add NAG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.93M |
Open | High | Low | Value | Volume |
2.3¢ | 2.4¢ | 2.2¢ | $135.4K | 5.920M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 899999 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 583069 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 378333 | 0.060 |
2 | 59000 | 0.059 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 182288 | 1 |
0.063 | 16847 | 1 |
0.065 | 25793 | 2 |
0.067 | 70000 | 1 |
0.070 | 5500 | 1 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
NAG (ASX) Chart |