The selected small crew has been mobilized to the site during the week to prepare Rig-2 for the operations. Early next week the well clean-out will commence and the swabbing unit will arrive to be readied to swab liquids for a period of about 2 weeks from the well and produced from one of the two oil bearing sandstone. This extended oil production test will be followed by a shut-in period to assess the reservoir pressure build-up.
GGX Price at posting:
2.9¢ Sentiment: Hold Disclosure: Held