Limited to none.
The second release sites are continuing as planned.
The overall build occurs over a 10 year period, producing small incremental changes to iiNet.
NBN Co is looking at an exclusive tendering deal rather than a picking on of the bids as they were received.
It is doubtful this necessarily means any long term impact on the NBN or iiNet.