MCE 3.85% 25.0¢ matrix composites & engineering limited

MitchpNameplate capacity means the plant is operating at or has...

  1. 46 Posts.
    lightbulb Created with Sketch. 1
    Mitchp

    Nameplate capacity means the plant is operating at or has been shown to be able to operate happily at its design capacity. So if Machine A was designed to produce 1000 buoys a month and it can/does do that, it is operating at nameplate capacity. If it doesn't, most owners get stressed. Some coy's share price can fall as it may point to expensive long term delays to ramp production up.

    Chart wise mce has dropped below recent support level. Next support level may be $2.50. Its hard to believe mce could go lower but there is no news and chart suggests it is out of favour. Im hanging on for now hoping that we are seeing bottom action at the current price.

    Regards
 
watchlist Created with Sketch. Add MCE (ASX) to my watchlist
(20min delay)
Last
25.0¢
Change
-0.010(3.85%)
Mkt cap ! $72.45M
Open High Low Value Volume
25.5¢ 25.5¢ 25.0¢ $26.89K 107.2K

Buyers (Bids)

No. Vol. Price($)
1 4000 24.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 75000 2
View Market Depth
Last trade - 15.43pm 29/11/2024 (20 minute delay) ?
MCE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.