NAE 0.00% 0.5¢ new age exploration limited

NAE Chart, page-757

  1. 2,579 Posts.
    lightbulb Created with Sketch. 3
    HIGHLIGHTS
    Scoping Study confirms robust economics for project development: from 2014
    NPV9 of US$263M (real, after tax, unleveraged)
    IRR of 20%
    ◦ Payback Period of 4.9 years (undiscounted)
    • Average annual saleable coal production of 1.4 Mt over a 26 year mine life from an underground
    longwall mine
    Low average annual operating costs of US$70 per tonne product resulting from short rail transport
    distances, low labour costs, royalties and taxes
    Realised coal sales price of US$143 per tonne assumed for Lochinvar low ash high volatile coking coal
    (including freight benefit)
    Strong operating cashflows averaging US$75M per annum with an operating margin of US$73 per tonne
    of clean coal
    • Low project construction capital cost of US$284M (including 13% contingency) with only 7km rail spur to
    connect to mainline rail to domestic customers and ports
    • High yield of 71% (all inclusive LOM average including roof and floor dilution)
    • Infill drilling and seismic surveys, first Reserve and Pre-Feasibility planned during 2015
    • Construction planned to commence in 2017 with first coal production planned in 2018

    The project back in 2014 looked pretty robust to me with cashflows of $75m per annum. that's not chump change .

    We are currently within range with an excellent scoping study with hopefully more savings!

    SF
    Last edited by spanishflare: 07/02/17
 
watchlist Created with Sketch. Add NAE (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $7.175M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
37 19647419 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 13493598 11
View Market Depth
Last trade - 16.12pm 03/12/2024 (20 minute delay) ?
NAE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.