What ever happens to the rights issue, drilling and surveying will continue at Nabarlek.
2nd phase drilling will be 1,700 metres, and a target radon cup survey of 20Km2 radon sampling was underway in July.
Results of the radon survey are due in early october with 2nd phase drilling to follow.