From Page 8 of the December presentation Grid power extension along highway, due mid 2019. 12km from T3 It seems to me that power will be in place before processing plant is up and running.
History-making uranium sample grades and an imminent drill run. Infini Resources is poised to transform in 2025
Week 48 Wrap: ASX flirts with 8,500pts; APRA declines mortgage loan easing; Trump's Bessent tied to Dem donor
ACW This biotech stock raised $11M in a risk-off environment. Its Alzheimer's drug could change the game