OXX 5.26% 3.6¢ octanex limited

Further to my last posts the timeframe given from first oil to...

  1. 603 Posts.
    lightbulb Created with Sketch. 79
    Further to my last posts the timeframe given from first oil to first offtake is 32 days.

    The capacity of the MTC Ledang was stated to be 350000 barrels. Hypothetically that is around 10000 barrels / day if filled, possibly they are only trialling the pumps and piping for the offtake tanker at this date with the first months production.

    Has any estimate production figures been spoken about ?

    Would 2-3000 b/day be unrealistic?
 
watchlist Created with Sketch. Add OXX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.