ROG 0.00% 0.8¢ red sky energy limited.

WE GOT THE APPROVAL< YIPPY GO ROG.....01 May 2012 09:43! ROG -...

  1. 4,881 Posts.
    lightbulb Created with Sketch. 5


    WE GOT THE APPROVAL< YIPPY GO ROG.....

    01 May 2012 09:43! ROG - Major Milestone - Talma Pilot receives approval

    MAJOR MILESTONE – TALMA PILOT WELL RECEIVES APPROVAL
    Key Points:
    · Approval has been granted to drill the Talma pilot well at the Company’s highly prospective
    Kangaroo Creek Sandstone gas resource in Clarence Moreton Basin, north east NSW;
    · Company announced a significant new discovery in the Kangaroo Creek Sandstone in 2011;
    · Approval is a major milestone for the Company - plan is to drill a pilot well in this gassy
    formation;
    · Next step is to contract a drilling rig and commence drilling the Talma pilot well.
    The directors of Red Sky Energy Limited (“Red Sky” or “the Company”) are pleased to announce that it
    has received regulatory approval to drill the proposed Talma pilot well at the Company’s highly
    prospective Kangaroo Creek Sandstone gas resource in the Clarence Moreton Basin in north east New
    South Wales.
    Red Sky’s application for regulatory approval for the Talma pilot well, in the form of a comprehensive
    Review of Environmental Factors (REF) document, was submitted in November 2011 (ASX
    announcement, 3 November, 2011). The REF included extensive stakeholder consultation and a rigorous
    assessment of impacts. It concluded that any impacts could be adequately managed.
    The Company now advises that the REF has been approved, and it will now proceed to contract a drilling
    rig and commence drilling of the Talma pilot well.
    Red Sky announced a significant new discovery (within PEL 457) in the Kangaroo Creek Sandstone in
    2011. Its intention is to drill the Talma pilot production well within the discovery area and perform a
    long term production test to determine the magnitude of the resource.
    The Company conducted a Resource Study on its Kangaroo Creek sandstone gas discovery resource in
    August (ASX announcement, 11 August 2011) which concluded that the discovery is a highly prospective
    lead. Red Sky plans to drill out the pilot well to expose the Kangaroo Creek formation over a 90 metre
    interval, from 480 metres to 570 metres depth
 
watchlist Created with Sketch. Add ROG (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $32.53M
Open High Low Value Volume
0.8¢ 0.8¢ 0.8¢ $182.1K 22.77M

Buyers (Bids)

No. Vol. Price($)
25 36939618 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 11435752 15
View Market Depth
Last trade - 16.10pm 08/11/2024 (20 minute delay) ?
ROG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.