26 April 2005 Australian Stock Exchange Limited Companies Announcement Office Electronic Lodgement System Dear Sir, ANNOUNCEMENT TO ASX DRILLING REPORT: BAYSTONE # 1 PEL 90, COOPER / EROMANGA BASIN, SA Stuart Petroleum Limited advises that at 0600 hours the Baystone #1 exploration well was at 2045m and undertaking rig repairs. Following good oil shows in the basal Birkhead / Hutton DST #1 was run over the interval 1936-1945m. The test recovered 40bbls of formation water in the drill string. This outcome was similar to the results at Reg Sprigg West #1. The next primary oil / gas target, the Tinchoo Formation is prognosed at 2239m. At Reg Sprigg West #1 the Tinchoo Formation is a productive oil and gas reservoir. The status of Baystone # 1 at 0600 hours (CST) on 26 April 2005 was: Location: PEL 90, 90km north of Innamincka Planned Total Depth: 2500 metres Current depth: 2045 metres Operations: Repairing rig Spud: 2100hrs, 11 April 2005 Participants in the Baystone #1 well are: Stuart Petroleum Limited (Operator) 75% (STU) Beach Petroleum Limited 25% (BPT) Yours faithfully, Tino Guglielmo Managing Director Level 7, 22 King William Street, Adelaide, South Australia 5000 Telephone: (08) 8410 0611 PO Box 8148, Station Arcade, Adelaide, South Australia 5000 Facsimile: (08) 8410 0250 S:\Company Secretary\ASX Announcements\Baystone #1\05-04-26 ASX Drilling Advice Baystone #1.doc
STU Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held